Research of productivity of drilling tools when driving main crosscut of horizon of the second stage of opening
User Rating: / 0
- Details
-
Category: Mining
-
Last Updated on 05 January 2013
-
Published on 05 January 2013
-
Hits: 3474
Authors: S.A. Kharin
Researches of parameters influencing on mine working driving intensity and rational organization of building have been conducted. It is shown that the productivity of drilling tools which allows providing required speed of mine working driving increases as far as duration of building of horizon of the second stage of opening reduces, thus the drilling productivity dependence on time of horizon building can be described by a power function.