COMPLEX CRITERION OF ACCIDENT RATE ESTIMATION DURING BUILDING AND EXPLOITATION OF EXTENSIVE MINE WORKING IN THE AREAS OF FLOODED GEOLOGICAL VIOLATIONS

User Rating:  / 0
PoorBest 

S.K. Meshchaninov, A.E. Kipko

The analysis of accident rate of the mine working has been resulted as a complex technical system, passed in the tectonic broken watered rock mass. During development of the criterion, failure genesis in the watered rock mass is considered as a multidimensional group degradation process on the basis of which procedure of control of the technical state of rock working has been desined. Offered criterion relies on using of the extrapolation algorithm.

Files:
2010_07-08 Mesch
Date 2012-12-14 Filesize 167.54 KB Download 923

Newer news items:

Older news items: