Towards estimation of workings efficiency near the watered tectonic violations

User Rating:  / 0
PoorBest 

 

Authors: A.Ye. Kipko
 
The article describes the results of analytical treatment of efficiency of technological process of drive working in conditions of watered tectonic broken rocks. It has been adduced that combined service is the most acceptable variant of technical service for preparatory working. Analytical expression for estimation of preparatory works efficiency has been got.
Files:
2010_06 Kip
Date 2012-12-14 Filesize 176.52 KB Download 884
Tags: efficiencyoptimizationdrilling worksemergency situationtechnical servicereliability

Related news items:

Newer news items: