Optimisation of the pitedges parameters at the open mine working
User Rating: / 0
- Details
-
Category: Development of fields
-
Last Updated on Monday, 24 December 2012 15:24
-
Published on Monday, 24 December 2012 15:24
-
Hits: 3786
Authors: Lituchyi V.V.
The solution of important scientific and technical problems of efficiency increase and decrease in ecological consequences of open-cast mining of horizontal deposits by optimisation of parameters pitedges, providing reduction of volumes overburden works and the areas, the residual developed spaces of open-cast mines is stated. Optimum parameters of a board of an open-cast mine are by means of special, offered by the author, iterative algorithm.